MIL-PRF-52308J
4.5 Methods of inspection. First article and conformance inspections shall include the
relevant inspections as listed in Table I.
TABLE I. Inspection requirements.
First Article (9+ samples)
Conformance
Inspection
FAT, set 1 FAT, set 2 FAT, set 3
(3+ samples) (2+ samples) (4+ samples)
(All samples)
Examination, 4.5.1
X
X
X
X
Structural strength, 4.5.2
X
X (or 4.5.3)
Differential pressure, operational
X
X (or 4.5.2)
performance, 4.5.3
Transit drop, 4.5.4.1
X
Resistance to fuel, high temp, 4.5.4.2
X
Resistance to fuel, low temp, 4.5.4.3
X
Resistance to salt water, 4.5.4.4
X
Post-environmental performance,
X
4.5.4.5
4.5.1 Examination. The elements shall be examined for the defects specified in Table II.
TABLE II. Visual defects.
Defect
Paragraph
Material not as specified.
3.2
Material not resistant to corrosion and deterioration or
3.2.1
not treated to be made resistant to corrosion and
deterioration.
Dissimilar metals in intimate contact.
3.2.2
Dimensions not as shown in Figure 1.
3.3.1
End caps mounting not as specified.
3.3.1.1
O-Rings in ends of element missing or damaged.
3.3.1.2
Dimensions of O-Rings not as shown in Figure 2.
3.3.1.2
Silicone compound not present as specified.
3.3.1.2 and
Figure 1, note 4
Identification marking incorrect, missing or illegible.
3.6.1
Workmanship not as specified.
3.6.2
7
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business