MIL-PRF-15618H (SH)
TABLE I. Inspection and test requirements.
Attribute
Requirement
Verification
First article
Conformance
INSPECTIONS
Elements
3.1
4.2.1
X
X
Materials
3.3
4.2.1
X
X
Gaskets
3.3.2
4.2.1
X
X
Air eliminator
3.5.2
4.2.1
X
X
Water-slug shutoff
3.5.3
4.2.1
X
X
Manual sump drain
3.5.4
4.2.1
X
X
3.5.5
4.2.1
X
X
Automatic sump drain
(if installed)
Sampling connection
3.5.6
4.2.1
X
X
Level indication
3.5.7
4.2.1
X
X
Pressure indication
3.5.8
4.2.1
X
X
Accessibility and location
3.5.9
4.2.1
X
X
Fabrication
3.5.10
4.2.1
X
X
Inlet and outlet connections
3.6.1
4.2.1
X
X
Element spacing
3.6.3
4.2.1
X
X
Element mounting
3.6.4
4.2.1
X
X
Access
3.7.1
4.2.1
X
X
Identification plate
3.9
4.2.1
X
X
TESTS
Hydrostatic
3.4.2
4.2.2 and 4.2.2.1
X
X
Full scale
4.2.2 and 4.2.2.2
X
3.4.1, 3.4.3,
3.4.4, and 3.5.1
Water defense system
3.5.3 and 3.5.5
4.2.2 and4.2.2.3
X
Shock
3.8.1
4.2.2 and 4.2.2.4
X
Vibration
3.8.2
4.2.2 and 4.2.2.5
X
Temperature variation
3.8.3
4.2.2 and 4.2.2.6
X
Materials
3.8.4
4.2.2 and 4.2.2.7
X
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business